Harold Holt – 25m Pool Re-grouting

Play Video

Harold Holt – 25m Pool Re-grouting

The Details

Project Completion: 20th May 2020

The City of Stonnington and Creo Consultants worked tirelessly to document and manage the re-grouting of the Indoor 25m Pool within a 4 week period with works commencing on 20th April 2020 through to refilling of the pool on the 20th May 2020. The works included the complete removal of the existing cementitious tile grout across the full extent of the pool floor and walls and re-grouting with new epoxy grout.

Play Video

Harold Holt – 25m Pool Re-grouting

The Details

Project Completion: 20th May 2020

The City of Stonnington and Creo Consultants worked tirelessly to document and manage the re-grouting of the Indoor 25m Pool within a 4 week period with works commencing on 20th April 2020 through to refilling of the pool on the 20th May 2020. The works included the complete removal of the existing cementitious tile grout across the full extent of the pool floor and walls and re-grouting with new epoxy grout.