Harold Holt – Leisure Pool Refurbishment

Play Video

Harold Holt – Leisure Pool Refurbishment

The Details

Project Completion: 31st May 2020

Creo Consultants partnered with the City of Stonnington to design, document and project manage the complete refurbishment of the Indoor Leisure Pool at the Harold Holt Memorial Swim Centre. The works encompassed a complete renovation of the Leisure, Learn To Swim, Toddler and Outdoor Splash pools, from demolition through to the completion of the installation of a new tiling system and subsequently recommissioning of the pools. A big thank you to the following project stakeholders:

  • City of Stonnington and Harold Holt Memorial Swim Centre Management and Staff for the proactive support and participation throughout the project.
  • On Time Developments Pty Ltd for successfully delivering the refurbishments work to such a high standard within a very strict time frame set by the project team.
  • Metz Specialty Materials Pty Ltd for the prompt procurement and delivery of tiles to enable the broader team to meet our time frames.
Play Video

Harold Holt – Leisure Pool Refurbishment​

The Details

Project Completion: 31st May 2020

Creo Consultants partnered with the City of Stonnington to design, document and project manage the complete refurbishment of the Indoor Leisure Pool at the Harold Holt Memorial Swim Centre. The works encompassed a complete renovation of the Leisure, Learn To Swim, Toddler and Outdoor Splash pools, from demolition through to the completion of the installation of a new tiling system and subsequently recommissioning of the pools. A big thank you to the following project stakeholders:

  • City of Stonnington and Harold Holt Memorial Swim Centre Management and Staff for the proactive support and participation throughout the project.
  • On Time Developments Pty Ltd for successfully delivering the refurbishments work to such a high standard within a very strict time frame set by the project team.
  • Metz Specialty Materials Pty Ltd for the prompt procurement and delivery of tiles to enable the broader team to meet our time frames.