Harold Holt – Warm Water Exercise Pool Refurbishment

Play Video

Harold Holt – Warm Water Exercise Pool Refurbishment

The Details

Project Completion: 10th May 2020

The refurbishment of the Indoor Warm Water Exercise Pool at the Harold Holt Memorial Swim Centre involved the complete replacement of the existing tiling and handrail system within the pool. The new tiling system features the unique application of an epoxy based tile adhesive throughout the pool with works from start to finish taking 14 weeks. The design, documentation and project management provided by Creo Consultants that facilitated the successful delivery of the Warm Water Exercise Pool Refurbishment would not have been possible without the following key stakeholders:

  • City of Stonnington and Harold Holt Memorial Swim Centre Management and Staff for their leadership and support.
  • Metz Specialty Materials Pty Ltd for the prompt procurement, manufacturing and delivery of tiles, adhesives and grout materials.
  • Metz Project Services Pty Ltd for the successful completion of the refurbishment works.
Play Video

Harold Holt – Warm Water Exercise Pool Refurbishment

The Details

Project Completion: 10th May 2020

The refurbishment of the Indoor Warm Water Exercise Pool at the Harold Holt Memorial Swim Centre involved the complete replacement of the existing tiling and handrail system within the pool. The a new tiling system features the unique application of an epoxy based tile adhesive throughout the pool with works from start to finish taking 14 weeks. The design, documentation and project management provided by Creo Consultants that facilitated the successful delivery of the Warm Water Exercise Pool Refurbishment would not have been possible without the following key stakeholders:

  • City of Stonnington and Harold Holt Memorial Swim Centre Management and Staff for their leadership and support.
  • Metz Specialty Materials Pty Ltd for the prompt procurement, manufacturing and delivery of tiles, adhesives and grout materials.
  • Metz Project Services Pty Ltd for the successful completion of the refurbishment works.